Industry field guide
Circuit board assembly rework data for AI inspection
An assembly inspection photo can show the right board and the wrong moment.
- Sector
- Manufacturing
- 2022 NAICS
- 334418
- Practice pack
- Example and answer key (JSON)
- Updated
What this guide tests
How should the two views appear in a training record?
See the specimen and fields · Work through the fictional records
Task and source context
An assembly inspection photo can show the right board and the wrong moment. If the photo predates rework, the next reviewer needs current evidence. The standards publisher describes IPC-A-610 and J-STD-001 as electronics assembly standards. A training board and fictional traveler can support a versioned review without sharing the standards text or an actual customer board. Electronics assembly standards announcement
Pair a before image and a later image of the same reference designator on an owned practice board. Add a rework event and qualified reviewer’s result, with timestamps and clear image orientation. Include another image with the correct orientation but the wrong board ID. Ask the model to select the evidence that belongs to the final state and flag any missing view. Keep optical observations distinct from functional test results.
Clear rights in board artwork and component images. Exclude production BOMs, customer serials, confidential rework settings, and unapproved failure imagery. Power the board down for all sample photography.
Industry research
The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.
334418 · Printed Circuit Assembly (Electronic Assembly) Manufacturing
This U.S. industry comprises establishments primarily engaged in loading components onto printed circuit boards or who manufacture and ship loaded printed circuit boards. Also known as printed circuit assemblies, electronics assemblies, or modules, these products are printed circuit boards that have some or all of the semiconductor and electronic components inserted or mounted and are inputs to a wide variety of electronic systems and devices.
Build a pilot sample
Set up this pilot
Photograph a cardboard board and marked component before and after a staged rework. Switch the board serial in one close-up and reject its timestamp as evidence for the requested board.
Prepare the test packets
- Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
- Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
- Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.
Fields the reviewer needs
- board_serial
- Pairs views of the same assembly
- reference_designator
- Locates the feature
- event_relative_time
- Distinguishes pre- and post-rework state
Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.
Fictional exercise
The same reference designator changes state after rework
An original paper board uses neutral reference positions. There is no actual electronics rework instruction.
| Record ID | Source | What it records |
|---|---|---|
| 1 | Before image | Board B7 position R4 has visible tilted paper token. |
| 2 | Rework log | A replacement event recorded for B7/R4 at 11:20. |
| 3 | After image | At 11:30 B7/R4 token appears aligned; surrounding positions not shown. |
Question for the model. How should the two views appear in a training record?
Show the reference answer
Retain the tilted observation before the event and the aligned observation after it for B7/R4, using all three records. The later image supersedes neither the historical label nor evidence for neighboring positions. It does not establish electrical functionality.
How to check the result
Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.
Errors to flag in this case
- Deduplicating before and after as contradictory copies
- Using post-event appearance as a functional test
Change the inputs and run it again
Record a second rework event without an after view; leave that latest visual state unverified.
Score the decision and the evidence separately
Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.
Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.
Check permission and scope
No real circuit diagrams, repair procedures, electrical tests or customer board images.
Leave out real circuit layouts, patient data, customer captures, credentials and protected equipment settings.
Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.
Sources and further reading
Resources for this workflow
Includes worksheet
What machinery and electronics manufacturers can contribute to AI
Match an equipment or electronics dataset to a configuration and checkable task.
Includes worksheet
Manufacturing AI sample worksheet: visible state and matching evidence
Build a specimen around a marked unit and independently checked observation.
Company and program reviews
Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.
Compare the approach
Dexset review: robotics capture, samples and acceptance
Compare multiple views, labels and what an export actually preserves for assembly tasks.
Compare the approach
Sama review for computer-vision labeling and model evaluation
Compare review criteria for hard-to-see state changes, occlusion and ambiguous labels.
Related industry examples
Industry guide · NAICS 334412
Bare printed circuit board inspection data for AI
A bare board inspection model needs to tell a real indication from an alignment error.
Industry guide · NAICS 334417
Connector mating data for training and evaluating AI
A connector that looks seated can still have a partly engaged latch.
Industry guide · NAICS 334419
Electronic component data for AI crystal and test references
Other electronic components include varied articles, so a useful dataset should name its specific product.