Turbines and turbine-generator sets have a defined Census manufacturing scope.

2022 NAICS
333611
Updated

What this guide tests

Which review state applies to the current configuration?

See the specimen and fields · Work through the fictional records

Task and source context

Turbines and turbine-generator sets have a defined Census manufacturing scope. An original task can connect a completed unit's module configuration with the test record actually supplied. Census turbine-manufacturing scope

Create fictional module serial references, a completed-unit register and two test reports. Add an original blade-row diagram with root and tip sample locations marked for the exercise. One report concerns a root-location specimen from module M1. A second concerns a tip-location specimen from another module. Ask which report answers the selected module-and-location request. Include a similarly numbered blade in a neighboring row so the position must remain explicit.

Record the row, blade reference, sample location and viewing side alongside the module identity. A completed-unit serial alone cannot identify the specimen. Evaluate with a rotated row diagram and an unfamiliar numbering sequence. Count wrong-row joins, root and tip interchanged, and a result attached to an unlinked specimen separately. A complete comparison should point to the exact location and report identifier that resolve it.

Use self-authored tables and invented values without operating equipment. Customer designs, proprietary performance data, licensed methods and outside inspection reports require appropriate authority and specialist review. A licensing brief should identify the configuration-history task and checked examples. Establish buyer requirements before preparing commercial operating histories or commissioning capture.

Discuss this original manufacturing sample with Fiund

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

333611 · Turbine and Turbine Generator Set Units Manufacturing

This U.S. industry comprises establishments primarily engaged in manufacturing turbines (except aircraft); and complete turbine generator set units, such as steam, hydraulic, gas, and wind.

U.S. Census Bureau, 2022 NAICS Manual, p. 254 ↗

Build a pilot sample

Set up this pilot

Create neutral turbine configuration cards and fictional test-event references. Attach an approved review to the superseded configuration and grade exact administrative status.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

module_serial
Distinguishes build states
test_event_id
Links the exact configuration
report_status
Separates draft from reviewed evidence

Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

A swapped module changes the evidence scope

Paper serial cards represent a fictional machine assembly. No operating points, design or performance are given.

Records supplied to the evaluator
Record IDSourceWhat it records
1Build registerUnit U5 contained module M8 for event A; M9 installed before event B.
2Report 1Event A, U5/M8; review complete.
3Report 2Event B, U5/M9; report status draft.

Question for the model. Which review state applies to the current configuration?

Show the reference answer

Report 2 is the current configuration's linked record because event B uses M9 under records 1 and 3. It is still draft. Report 1 remains completed evidence for the earlier M8 build and cannot change the draft state of M9.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Joining on the unit serial alone
  • Treating draft report presence as completed review

Change the inputs and run it again

Include a later report revision that changes only status and retain earlier state in as-of snapshots.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

No real turbine design, test procedures, performance values, operation or suitability claims.

Use nonoperational illustrations and invented measurements. Exclude service instructions, process controls and actual equipment specifications.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Manufacturing