Skip to content

Industry field guide

School and employee bus stop-change records for AI

A stop change may be approved for one date and drafted for another.

2022 NAICS
485410
Updated

What this guide tests

Which stops are supported for R on D1 and D2, and can the later draft or R2 note authorize S3 for R?

See the specimen and fields · Work through the fictional records

Task and source context

A stop change may be approved for one date and drafted for another. NHTSA publishes school bus route and stop planning resources. An operator can test document matching with a fictional bus run and distinct evidence for the current and planned stop. For an employee shuttle, the same exercise can use a generic worksite and a role-based notice. NHTSA school bus stop and route resources

Write a practice schedule and a dated approval. Add a draft notice with a newer file date but a later intended service date. Ask which stop applies to a named training run and whether the notice was authorized. Keep an earlier approved note for another route so the model must match the run identifier. The expected answer reports documentary evidence only.

Use no student or employee lists, school locations, home stops, access plans, or live vehicle positions. Work with fabricated records. Keep stop selection and rider notification under authorized human control.

Describe a bus change review dataset

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

485410 · School and Employee Bus Transportation

This industry comprises establishments primarily engaged in providing buses and other motor vehicles to transport pupils to and from school or employees to and from work.

U.S. Census Bureau, 2022 NAICS Manual, p. 385 ↗

Build a pilot sample

Set up this pilot

Make dummy route plans with a signed day-specific stop revision. Attach an unsigned draft and a neighboring run note, then grade approved stops by date.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

Run and service date
Defines applicability.
Approved stop and changed field
Preserves the revision.
Signature and draft state
Limits authorization.

Use Who buys logistics workflow data for AI? to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

A newer draft file does not replace the approved stop for another service date

An original schedule fixture uses a generic training run and abstract stops. It contains no child, employee, school, home, rider list or live vehicle location.

Records supplied to the evaluator
Record IDSourceWhat it records
SBX1Approved run recordRun R/day D1 serves stop S1. Original approval explicitly names R and D1.
SBX2Authorized revisionFor R/D2 only, signed notice changes S1 to S2. No retroactive D1 change.
SBX3Later fileDraft saved after the revision proposes S3 for R/D3, unsigned. Separate approved S3 note names run R2, not R.

Question for the model. Which stops are supported for R on D1 and D2, and can the later draft or R2 note authorize S3 for R?

Show the reference answer

SBX1 supports S1 for R/D1. SBX2 supports S2 for R/D2 only, preserving D1's earlier stop. SBX3's R/D3 proposal remains unsigned, while its signed S3 note belongs to another run. Neither establishes an approved S3 change for R. Keep service date and run identity with approval status rather than select the newest file or an approved record with the wrong target. The task gives no live boarding instruction.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Applying a future-date stop change to an earlier run.
  • Treating a newer draft or another route's approval as current authority.

Change the inputs and run it again

Ask for R/D3 with no new approval. Require an unresolved future-change status rather than inherit R2's stop.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

Use fabricated schedules and notices. Exclude actual locations and access plans; stop selection and notifications remain under authorized human control.

Avoid passenger and driver identifiers, live private trip feeds and security-sensitive operational information.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Transportation and warehousing