Skip to content

Industry field guide

Mining equipment data for AI module and serial records

Mining machinery covers several equipment types within the Census classification.

2022 NAICS
333131
Updated

What this guide tests

Which report should the reviewer attach to the current module?

See the specimen and fields · Work through the fictional records

Task and source context

Mining machinery covers several equipment types within the Census classification. A contributor can define a focused document task around a replaceable module and the history that connects it to a completed machine. Census mining-machinery scope

Write a fictional machine register, module assembly traveler and inspection index. Replace one module reference during production while retaining the earlier parts list. Ask the assistant which inspection record supports the completed configuration. Include a similar module with the same nominal interface but a different serial reference, plus a proposed replacement that was canceled.

Annotate machine, module, serial reference, assembly event, inspection date and document status. Evaluation can use a new identifier scheme and a split module history. Score matching by nominal interface alone, using the canceled replacement and selecting an earlier configuration's result independently. The key should identify the exact evidence linking module and machine.

Use self-authored forms and invented references without operating equipment. Customer mine information, licensed designs, proprietary production records and outside inspection documents require appropriate permissions. Explain the configuration-history task and independent key in the licensing brief. Confirm buyer requirements before preparing a larger commercial archive or commissioning new capture.

Discuss this original manufacturing sample with Fiund

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

333131 · Mining Machinery and Equipment Manufacturing

This U.S. industry comprises establishments primarily engaged in (1) manufacturing underground mining machinery and equipment, such as coal breakers, mining cars, core drills, coal cutters, and rock drills, and (2) manufacturing mineral beneficiating machinery and equipment used in surface or underground mines.

U.S. Census Bureau, 2022 NAICS Manual, p. 246 ↗

Build a pilot sample

Set up this pilot

Use an invented mining-module installation timeline and two inspection cards. Move a module after its check and grade report identity and installed interval separately.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

module_serial
Distinguishes physical instances
installed_interval
Determines current configuration
inspection_subject
Pins report to inspected module

Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

A prior module report survives a module replacement as history

An invented heavy-equipment register contains neutral serials only. No site or operational details appear.

Records supplied to the evaluator
Record IDSourceWhat it records
1Assembly historyUnit M4 originally used module A17; replaced with A22 Tuesday.
2Inspection indexReport R4 for A17 Monday; no A22 report.
3QueryFind the module evidence applicable to Wednesday's configuration.

Question for the model. Which report should the reviewer attach to the current module?

Show the reference answer

None in the packet. Wednesday's module is A22 under record 1. R4 in record 2 applies to the removed A17 and stays historical for M4. The same base machine identifier in record 3 does not transfer inspection evidence to the replacement.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Carrying a removed module's inspection forward
  • Dropping replacement history from current configuration

Change the inputs and run it again

Return A17 to M4 after a later event; distinguish reinstallation from evidence of a fresh inspection.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

No mine locations, real fleet records, equipment service guidance or safety claims.

Use nonoperational illustrations and invented measurements. Exclude service instructions, process controls and actual equipment specifications.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Manufacturing