Industrial machinery data for AI change-order execution
Other industrial machinery covers varied products.
- Sector
- Manufacturing
- 2022 NAICS
- 333248
- Practice pack
- Example and answer key (JSON)
- Updated
What this guide tests
What should the build status say about CR7?
See the specimen and fields · Work through the fictional records
Task and source context
Other industrial machinery covers varied products. A specific custom-module exercise can test whether an assistant follows an engineering change into the record of what was built. The Census manual provides category context. Census industrial-machinery scope
Create a fictional module drawing, change request and assembly record. Approve a new component reference for future units while leaving the selected unit on its earlier configuration. Ask which drawing and component list apply to that unit. Include a purchase order for the new component and a later service note that does not document installation.
Annotate unit, change effectivity, requested part, executed assembly and source date. Evaluation can change the serial convention and introduce a fully documented update. Score future changes applied to earlier units, purchasing treated as installation and unsupported configuration assumptions independently. The key should recognize both the unchanged earlier configuration and a completed supported update.
Use original drawings and invented records. Customer designs, licensed specifications and proprietary project histories require source-specific permission. Describe the effectivity-review task and qualified reviewer process in the licensing brief. Confirm the buyer's accepted sources and required historical relationships before preparing a larger archive.
Industry research
The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.
333248 · All Other Industrial Machinery Manufacturing
This U.S. industry comprises establishments primarily engaged in manufacturing industrial machinery (except agricultural and farm-type; construction and mining machinery; food manufacturing-type machinery; semiconductor making machinery; and sawmill, woodworking, and paper making machinery).
Build a pilot sample
Set up this pilot
Write an invented change request and an effectivity table spanning two units. Record the old component on one affected build and distinguish scheduled from executed change.
Prepare the test packets
- Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
- Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
- Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.
Fields the reviewer needs
- change_request_id
- Links the approved action
- build_effectivity
- Defines where it should apply
- executed_component
- Records what was actually installed
Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.
Fictional exercise
An approved change is not an executed change
A toy machine module and fictional ticket log cover a single documented change.
| Record ID | Source | What it records |
|---|---|---|
| 1 | Change request | CR7 approves replacing module A with B after build 20. |
| 2 | Build traveler | Build 24 still lists A; no execution event for CR7. |
| 3 | Photo | Module tag A visible on 24. |
Question for the model. What should the build status say about CR7?
Show the reference answer
CR7 is applicable to build 24 under record 1, but its execution is not supported. Records 2 and 3 instead show A, the pre-change module. Flag an approved-versus-built discrepancy; do not count approval as installation or infer why it was not executed.
How to check the result
Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.
Errors to flag in this case
- Treating approval as installation evidence
- Ignoring the effective build range
Change the inputs and run it again
Log an approved deferral for builds 21–25 only; keep build 24 distinct from build 26.
Score the decision and the evidence separately
Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.
Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.
Check permission and scope
No real industrial equipment drawings, production changes, maintenance procedures or safety conclusions.
Use nonoperational illustrations and invented measurements. Exclude service instructions, process controls and actual equipment specifications.
Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.
Sources and further reading
Resources for this workflow
Includes worksheet
What machinery and electronics manufacturers can contribute to AI
Match an equipment or electronics dataset to a configuration and checkable task.
Includes worksheet
Manufacturing AI sample worksheet: visible state and matching evidence
Build a specimen around a marked unit and independently checked observation.
Company and program reviews
Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.
Compare the approach
Dexset review: robotics capture, samples and acceptance
Compare multiple views, labels and what an export actually preserves for assembly tasks.
Compare the approach
Sama review for computer-vision labeling and model evaluation
Compare review criteria for hard-to-see state changes, occlusion and ambiguous labels.
Related industry examples
Industry guide · NAICS 333241
Food machinery data for AI contact-part configuration
3-A publishes standards for equipment within its scope.
Industry guide · NAICS 333242
Semiconductor machinery data for AI event and revision matching
SEMI publishes standards for semiconductor equipment and industry systems.
Industry guide · NAICS 333243
Woodworking and paper machinery data for AI roll-layout review
This machinery category serves several material processes.