An owner can approve a window selection while the site packet still shows the prior opening.

2022 NAICS
236115
Updated

What this guide tests

Which selection has a documented approval-to-observation chain, and what can be said about W2's Green request?

See the specimen and fields · Work through the fictional records

Task and source context

An owner can approve a window selection while the site packet still shows the prior opening. A useful evaluation tests whether the assistant can follow that change into the correct room and drawing. DOE documents flashed opening details, and Troveo’s construction guide describes interest in project and decision records. Its description is a reason to ask about fit for a particular workflow. DOE building opening reference · Troveo construction data guide

Draw two imaginary openings. Pair one owner-approved selection with an updated schedule and a matching mock inspection. Give the other only a selection request. Ask which change is documented, whether the practice observation matches the correct opening, and what evidence is missing.

Use independently drawn plans and dummy selections. Clear any architect, owner, and subcontractor rights separately. Exclude addresses, signatures, private finishes, and actual site photographs.

Describe a selection handoff sample

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

236115 · New Single-Family Housing Construction (except For-Sale Builders)

This U.S. industry comprises general contractor establishments primarily responsible for the entire construction of new single-family housing, such as single-family detached houses and town houses or row houses where each housing unit (1) is separated from its neighbors by a ground-to-roof wall and (2) has no housing units constructed above or below.

U.S. Census Bureau, 2022 NAICS Manual, p. 120 ↗

Build a pilot sample

Set up this pilot

Make two paper opening schedules and a signed color change for one opening. Stage an installed label for the approved item and keep the other request pending.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

Opening identifier
Keeps similar room selections separate.
Selection approval and effective revision
Links an authorized choice to the right schedule.
Observed label and review reference
Records what the mock observation actually verifies.

Use How construction and trade teams can contribute data for AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

Follow an approved selection to the correct opening

An independently drawn practice home has openings W1 and W2. A selection request, schedule and mock observation show different stages of the handoff.

Records supplied to the evaluator
Record IDSourceWhat it records
CH1Owner selection recordOpening W1: option Blue approved; W2: option Green requested, approval absent.
CH2Fictional opening schedule revision 4W1 updated to Blue. W2 remains option Amber. Revision 3 is superseded for W1 only.
CH3Mock reviewObservation names W1, schedule revision 4 and a Blue-labeled prop. No observation names W2.

Question for the model. Which selection has a documented approval-to-observation chain, and what can be said about W2's Green request?

Show the reference answer

CH1–CH3 connect W1's approved Blue selection to revision 4 and a matching mock observation. W2 has only a Green request; its schedule still lists Amber and no W2 observation is supplied. The request does not prove approval, a schedule update or installation. Record those stages separately and flag the unresolved change rather than asserting that Green was installed.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Applying W1's approval to every opening in the practice home.
  • Treating W2's requested option as the current scheduled or observed product.

Change the inputs and run it again

Add an approved Green selection for W2 but leave the schedule unchanged. Ask the system to identify the new approval and the still-open schedule-to-observation handoff.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

Use dummy options and independent plans. Exclude real addresses, signatures, architect drawings, client selections and installation details.

Keep customer addresses, access codes and confidential drawings out of the test material. Obtain authorization for any identifiable site imagery.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Construction