Skip to content

Industry field guide

Commercial lighting data for AI photometric-record scope

The Department of Energy publishes lighting information.

2022 NAICS
335132
Updated

What this guide tests

Can the reviewer use report A?

See the specimen and fields · Work through the fictional records

Task and source context

The Department of Energy publishes lighting information. A manufacturer can define an original task that keeps a photometric observation attached to the fixture configuration and measurement quantity actually recorded. DOE lighting context

Write fictional fixture and optic references, a test-object register and a result table. The request names fixture F1, optic A and angle 30 in the exercise's defined reference plane. Supply F1 at angle 60 and F2 at angle 30, plus a separate total-output entry for F1. The answer key identifies the requested directional observation as absent. It should reject a value borrowed from F2 and any interpolation unsupported by a supplied rule.

Add a second view whose angle origin is marked on the opposite side of the fixture. Ask the reviewer to identify the reference plane before selecting a table row. Reserve a different optic shape and angle arrangement for evaluation. Count fixture substitution, angle-reference confusion and total output used for a directional request as separate errors. Include one complete F1/optic-A case with the requested observation present.

Use self-authored tables and invented values. Customer lighting designs, licensed photometric files, program artwork and outside reports need permission and qualified review. Describe the quantity-and-configuration task and checked key in the contributor brief. Confirm buyer requirements before preparing a larger archive or additional capture.

Discuss this original manufacturing sample with Fiund

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

335132 · Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing

This U.S. industry comprises establishments primarily engaged in manufacturing commercial, industrial, and institutional electric lighting fixtures.

U.S. Census Bureau, 2022 NAICS Manual, p. 273 ↗

Build a pilot sample

Set up this pilot

Draw two neutral lighting assemblies with different configurations. Give one report a matching fixture but wrong distribution setup. Score configuration and report scope without inferring a missing field.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

test_object_configuration
Combines fixture and optic
report_status
Distinguishes draft from published data
distribution_field_status
Records whether the requested field exists

Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

An optic change produces a distinct test object

Fictional fixture and optic tokens use arbitrary output fields, with no real lighting specifications.

Records supplied to the evaluator
Record IDSourceWhat it records
1Test-object registerUnit F1 tested with optic O2 in report A; with O3 in report B.
2Report indexA contains distribution field; B has draft status and no distribution field.
3RequestFind distribution evidence for F1/O3.

Question for the model. Can the reviewer use report A?

Show the reference answer

No. Report A's field is available only for F1/O2 under records 1 and 2. F1/O3 has a linked draft B but no documented distribution in the packet. Preserve the optic option and report state rather than copying results across configurations.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Joining fixture family but ignoring optic
  • Treating report presence as result availability

Change the inputs and run it again

Provide a single report with separate rows for two optics; match row scope instead of the title alone.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

No actual photometry, fixture selection, code compliance or customer installation design.

Exclude actual wiring, ratings, safety procedures and private installation or test records.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Manufacturing