Skip to content

Industry field guide

Battery manufacturing data for AI cell and pack evidence

UL Solutions describes testing at battery module and pack levels.

2022 NAICS
335910
Updated

What this guide tests

Which reports meet the requested assembly scope?

See the specimen and fields · Work through the fictional records

Task and source context

UL Solutions describes testing at battery module and pack levels. A manufacturer can propose an original task that preserves the exact tested configuration and the scope of each supplied record. UL module and pack testing context

Create fictional cell, module and pack identifiers with a completed-assembly register. Give one report a cell-only scope and another a stated pack configuration. Ask the assistant which evidence concerns the selected assembly. Include a component substitution proposed after the report and a pack record missing its configuration version. The key should identify those limits.

Annotate component level, assembly, configuration, report scope, effective version and date. Evaluate with a new identifier scheme. Score cell evidence extended to an undocumented pack, a proposed substitution treated as installed and a report assigned to an unknown version independently. The exercise should use invented records and provide no charging, fabrication or live test instructions.

Use original documents and neutral references reviewed by an appropriate specialist. Actual customer designs, licensed methods, proprietary chemistry and outside reports require explicit authority. A licensing brief should state the scope-review task and checked examples. Confirm buyer requirements before preparing commercial histories or commissioning capture.

Discuss this original manufacturing sample with Fiund

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

335910 · Battery Manufacturing

This industry comprises establishments primarily engaged in manufacturing primary and storage batteries.

U.S. Census Bureau, 2022 NAICS Manual, p. 277 ↗

Build a pilot sample

Set up this pilot

Give a dummy battery pack a cell sheet, module sheet and exact assembly report. Hold pack scope constant and score whether each report names the requested assembly level.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

assembly_level
Distinguishes cell, module and pack
tested_identifier
Identifies the actual subject
parent_pack_link
Supports navigation without expanding scope

Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

A cell report does not become a pack result

Fictional identifiers describe paper cell, module and pack tokens. There is no electrical configuration or test procedure.

Records supplied to the evaluator
Record IDSourceWhat it records
1Build ledgerPack P7 contains module M3, which contains cell C4.
2Report indexR1 covers C4; R2 covers M3; no P7 entry.
3RequestRetrieve evidence on the completed P7 pack.

Question for the model. Which reports meet the requested assembly scope?

Show the reference answer

Neither. Records 1 and 2 show that R1 and R2 concern descendants of P7 at different levels. Their links can be retained in a parts evidence view, but they do not constitute a completed-pack report for the exact request in record 3.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Treating lower-level evidence as pack validation
  • Joining only through containment without preserving report grain

Change the inputs and run it again

Provide a pack report for P7 before a module replacement and require the configuration date for applicability.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

No real cells, charging or assembly advice, safety claims, electrical values or certification.

Exclude actual wiring, ratings, safety procedures and private installation or test records.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Manufacturing