Skip to content

Industry field guide

Wastewater process events for AI incident review

A process assistant can be tested on whether it distinguishes a failed instrument from a real change in a treatment stage.

Sector
Utilities
2022 NAICS
221320
Updated

What this guide tests

What difference is supported between the two evidence patterns, and can either cause be diagnosed from the packet?

See the specimen and fields · Work through the fictional records

Task and source context

A process assistant can be tested on whether it distinguishes a failed instrument from a real change in a treatment stage. NIST’s industrial control testbed research shows how controlled processes can support measurement and testing. EPA separately addresses security practices for water and wastewater systems. Use an isolated example before evaluating any operational record. NIST industrial control system testbed · EPA water sector security guidance

Build a paired sensor and lab observation

Use invented measurements for a treatment training scenario. Set one case where an online reading changes but a confirmatory measurement stays stable, and another where both change. Include sample timing, method, units and the documented reason an operator escalates. A model should identify the difference and request more evidence when the records conflict. The evaluation can measure recognition and escalation without giving a model control authority.

Keep operating information in the approved environment

Use a simulation or training rig that cannot touch production systems. Exclude site coordinates, process setpoints, access details, system diagrams and sensitive incident records from the first sample. Verify who can authorize operational information and what the intended use permits.

Send a fabricated event timeline and evidence rubric. Distinguish simulated examples from authorized real data in the description. Describe a dataset

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

221320 · Sewage Treatment Facilities

This industry comprises establishments primarily engaged in operating sewer systems or sewage treatment facilities that collect, treat, and dispose of waste.

U.S. Census Bureau, 2022 NAICS Manual, p. 117 ↗

Build a pilot sample

Set up this pilot

Use two simulated wastewater observation packets, one measured and one reported. Grade method, interval and documented evidence, leaving causal diagnosis open.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

Sample interval and unit
Check that compared observations refer to the same stated basis.
Measurement origin
Keep online and confirmatory sources distinct.
Verified cause status
Preserve whether an independent finding was actually supplied.

Use Plan a sample of business data for AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

Compare invented observations without diagnosing their cause

A detached paper scenario provides artificial online and confirmatory values. It tests evidence consistency and review needs, with no process-control authority.

Records supplied to the evaluator
Record IDSourceWhat it records
CASE-W1First simulated intervalAn online demonstration value changes from 4 to 8. A separately documented confirmatory observation remains 4 under the stated matching interval and unit.
CASE-W2Second simulated intervalThe online value changes from 4 to 8, and a matching confirmatory observation is also 8.
CAUSE-W3Available evidence noteNeither case includes a verified instrument-fault finding or a documented process cause.

Question for the model. What difference is supported between the two evidence patterns, and can either cause be diagnosed from the packet?

Show the reference answer

W1 contains disagreement between the supplied online and confirmatory observations; W2 contains agreement under the stated matching basis. That pattern does not by itself establish an instrument failure or a process cause. W3 explicitly supplies neither finding. Report the disagreement or agreement, cite the source and preserve the need for qualified review rather than infer a control response.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Calling disagreement definitive proof of a failed instrument.
  • Treating agreement between two values as proof of a particular process cause.

Change the inputs and run it again

Shift the confirmatory sample to another interval. The evaluator must identify the timing mismatch before comparing its values.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

All values are invented and disconnected from equipment. Exclude setpoints, diagrams, coordinates, credentials, real incidents and any production-system access.

Use a controlled simulation or an authorized export with topology, customer details and control-system information removed.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Utilities