Industry field guide
Waste combustor monitoring interval and revision records for AI
A monitoring export and daily summary can refer to the same date but cover different intervals.
- 2022 NAICS
- 562213
- Practice pack
- Example and answer key (JSON)
- Updated
What this guide tests
Which H1 value is current, and does the supplied evidence support complete coverage of D's stated day?
See the specimen and fields · Work through the fictional records
Task and source context
A monitoring export and daily summary can refer to the same date but cover different intervals. EPA publishes standards and supporting material for large municipal waste combustors. A plant operator can test record interpretation with invented measurements and abstract instrument identifiers. EPA large municipal waste combustor resources
Make a fictional daily report and two hourly exports. Mark one interval missing and flag another as superseded by a corrected export. Ask which hours have current measurements and whether the source supports complete coverage for the day. Use the answer key to score missingness, units and revision handling separately.
Keep plant settings, thresholds, emissions histories and equipment screens out. Keep the exercise on data provenance and coverage. Qualified staff retain responsibility for reporting decisions.
Industry research
The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.
562213 · Solid Waste Combustors and Incinerators
This U.S. industry comprises establishments primarily engaged in operating combustors and incinerators for the disposal of nonhazardous solid waste. These establishments may produce byproducts, such as electricity and steam.
Build a pilot sample
Set up this pilot
Build synthetic hourly monitor exports with one corrected reading and one gap at midnight. Grade current value and complete day coverage independently.
Prepare the test packets
- Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
- Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
- Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.
Fields the reviewer needs
- Sensor, UTC day and hour
- Defines the interval.
- Value, unit and superseded export
- Preserves the current measurement.
- Coverage requirement and unresolved mapping
- Makes completeness reproducible.
Use Build an AI evaluation sample for service handoffs to turn the specimen into a brief with a defined task, source and review owner.
Fictional exercise
A revised hourly export does not fill a different missing interval
An original monitoring fixture uses arbitrary units and abstract sensor aliases. It contains no actual emissions, threshold, plant setting, equipment screen or reporting rule.
| Record ID | Source | What it records |
|---|---|---|
| WC1 | Daily report D | Practice UTC day 2 requires 24 named hourly intervals for full coverage under this invented completeness check. H1=10 U, H2 missing; H3–H24 present. |
| WC2 | Corrected export | H1-v2 explicitly supersedes H1's value with 12 U, same day and sensor. Does not cover H2. |
| WC3 | Loose export | Value 11 U labeled hour 2 but local-time basis unspecified and sensor ID absent. No verified UTC H2 association. |
Question for the model. Which H1 value is current, and does the supplied evidence support complete coverage of D's stated day?
Show the reference answer
WC2 explicitly replaces H1's ten with 12 practice units for the named UTC day and sensor. H2 remains missing because WC3 lacks the time basis and sensor identity needed to associate it with that interval. The fixture therefore supports 23 of 24 required hourly intervals, not complete coverage. Preserve revision and missingness separately without interpolating H2 or making an emissions, compliance or regulatory-reporting conclusion.
How to check the result
Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.
Errors to flag in this case
- Counting original and corrected hourly exports as separate covered intervals.
- Filling a missing UTC interval from an unverified local-time or unidentified-sensor record.
Change the inputs and run it again
Supply WC3's verified UTC conversion and exact sensor link to H2. Require full coverage only after the complete association is established.
Score the decision and the evidence separately
Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.
Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.
Check permission and scope
Use independently invented measurements. Exclude operating settings, thresholds and actual histories; qualified staff retain all reporting decisions.
Exclude hazardous operations, real site coordinates and restricted records. Use inert objects in a visual exercise.
Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.
Sources and further reading
Resources for this workflow
Company and program reviews
Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.
Compare the approach
micro1 review for experts, trade footage and company data
Compare the prerequisites for an approved recording project before planning a contribution.
Compare the approach
Sama review for computer-vision labeling and model evaluation
Review labeling scope for visual state and exception checks in staged footage.
Related industry examples
Industry guide · NAICS 562211
Hazardous waste treatment receipt and closeout records for AI
A receiving facility can document that a shipment arrived before any treatment record exists.
Industry guide · NAICS 562212
Landfill weigh tickets and reporting basis data for AI
A landfill’s scale ticket can show a load weight in one unit while a summary uses a different unit or period.
Industry guide · NAICS 562219
Organics processing batch lineage and disposition data for AI
An organics processor can evaluate whether software preserves lot lineage across mixing, diversion and a later batch release.