Industry field guide
Elevator equipment data for AI door and unit records
Elevator and moving-stairway manufacturing is a defined Census category.
- Sector
- Manufacturing
- 2022 NAICS
- 333921
- Practice pack
- Example and answer key (JSON)
- Updated
What this guide tests
Which opening's assembly should be checked?
See the specimen and fields · Work through the fictional records
Task and source context
Elevator and moving-stairway manufacturing is a defined Census category. An original document exercise can focus on unit identity, door handing and the drawing revision supplied. Census elevator-equipment scope
Create a fictional unit register, an original door drawing and assembly records for two landing references. State the viewing direction explicitly. Ask the assistant which assembly matches the issued drawing. Include a mirrored service view and a proposed door change that applies only to later units. The key should preserve the unit-specific effectivity and reference direction.
Annotate unit, landing reference, handed feature, drawing revision, viewing side and execution status. Evaluate with a new drawing layout and identifier convention. Score mirrored interpretation, future changes applied to earlier units and a proposal treated as installed independently. The exercise should compare records without supplying control-system details or an operating-safety determination.
Use self-authored diagrams and inert props. Customer building plans, licensed designs, inspection reports and proprietary unit histories need appropriate authority and specialist review. Describe the identity-and-effectivity task and checked key in the licensing brief. Establish buyer requirements before preparing commercial records or capture.
Industry research
The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.
333921 · Elevator and Moving Stairway Manufacturing
This U.S. industry comprises establishments primarily engaged in manufacturing elevators and moving stairways.
Build a pilot sample
Set up this pilot
Draw two unpowered door props with reversed handing on adjacent floors. Mark opening side and assembly ID separately. Grade the flagged opening using its complete key.
Draw a mock floor map with two openings on the same side and a marked reference view for each. Give the photo an exact opening key plus a separate orientation tag. Grade documented opening identity before comparing handing, and withhold any operational conclusion from the unpowered mockup.
Prepare the test packets
- Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
- Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
- Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.
Fields the reviewer needs
- unit_floor
- Locates the broader assembly
- opening_side
- Resolves front versus rear
- panel_variant
- Matches the opening-specific record
Use What machinery and electronics manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.
Fictional exercise
A landing number alone does not identify the opening
Fictional drawings represent two sides of a paper unit. No actual controls or installation details are included.
| Record ID | Source | What it records |
|---|---|---|
| 1 | Unit register | U7 at floor 2 has front opening F2 and rear opening R2. |
| 2 | Assembly list | F2 uses mock left panel L; R2 uses mock right panel R. |
| 3 | Photo | U7 floor 2 rear marker visible; panel labeled L. |
Question for the model. Which opening's assembly should be checked?
Show the reference answer
Check R2, because the rear marker in record 3 resolves the opening within the floor in record 1. Record 2 expects R at R2, while the picture shows L. L would match F2, so a floor-only join would hide the mismatch.
How to check the result
Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.
Errors to flag in this case
- Using unit and floor while ignoring opening side
- Applying front-opening evidence to the rear
Change the inputs and run it again
Add two openings on one side with separate markers; require the exact opening key.
Score the decision and the evidence separately
Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.
Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.
Check permission and scope
No real lift layouts, safety system data, servicing or installation advice.
Use nonoperational illustrations and invented measurements. Exclude service instructions, process controls and actual equipment specifications.
Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.
Sources and further reading
Resources for this workflow
Includes worksheet
What machinery and electronics manufacturers can contribute to AI
Match an equipment or electronics dataset to a configuration and checkable task.
Includes worksheet
Manufacturing AI sample worksheet: visible state and matching evidence
Build a specimen around a marked unit and independently checked observation.
Company and program reviews
Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.
Compare the approach
Dexset review: robotics capture, samples and acceptance
Compare multiple views, labels and what an export actually preserves for assembly tasks.
Compare the approach
Sama review for computer-vision labeling and model evaluation
Compare review criteria for hard-to-see state changes, occlusion and ambiguous labels.
Related industry examples
Industry guide · NAICS 333998
General-purpose machinery data for AI filter assembly evidence
This broad machinery category benefits from a specific article and task.
Industry guide · NAICS 333923
Crane and hoist data for AI unit and test-report identity
Overhead cranes and hoists have a defined Census manufacturing scope.
Industry guide · NAICS 333992
Welding equipment data for AI mode and log context
The American Welding Society publishes industry resources.