Skip to content

Industry field guide

Boiler and heat-exchanger data for AI report identity

ASME publishes manufacturer data-report forms.

2022 NAICS
332410
Updated

What this guide tests

Can R5 be attached to E2?

See the specimen and fields · Work through the fictional records

Task and source context

ASME publishes manufacturer data-report forms. A manufacturer can define an original administrative task around the exact unit, configuration and report scope supplied. ASME data-report context

Create fictional unit references, component registers and a report index. Give two units similar catalog descriptions but different identifiers. Ask the assistant which report concerns the selected assembly. Include a component-only record and a proposed change with no execution entry. The key should preserve their scope and status instead of treating every document as evidence for the complete current unit.

Annotate unit, component, configuration, report type, effective revision and source scope. Evaluate with a new index layout and serial convention. Score catalog-family matching used as exact identity, component evidence extended beyond its scope and a proposal treated as executed independently. The exercise should supply no operating settings or certification determination.

Use original forms with neutral mock references and invented values. Customer designs, licensed standards, certification artwork and outside inspection reports require authority and qualified review. Describe the identity-review task and checked key in the licensing brief. Establish buyer requirements before preparing commercial histories or new capture.

Discuss this original manufacturing sample with Fiund

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

332410 · Power Boiler and Heat Exchanger Manufacturing

This industry comprises establishments primarily engaged in manufacturing power boilers and heat exchangers. Establishments in this industry may perform installation in addition to manufacturing power boilers and heat exchangers.

U.S. Census Bureau, 2022 NAICS Manual, p. 232 ↗

Build a pilot sample

Set up this pilot

Index a paper parent unit with two exchangeable-looking component reports. Request the sibling component and require an explicit component identifier before attaching either report.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

parent_unit
Groups components without expanding evidence
component_report_key
Identifies the component named by the report
request_scope
Specifies whether an exact component match is needed

Use What fabricated and specialty product manufacturers can contribute to AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

A system-level folder contains a component-level report

A mock diagram shows two paper boxes. It carries no pressure, temperature, design or certification information.

Records supplied to the evaluator
Record IDSourceWhat it records
1Unit mapSystem U7 includes component E2 and component E3.
2Report indexReport R5 names E3; stored under U7.
3RequestFind the evidence for E2 specifically.

Question for the model. Can R5 be attached to E2?

Show the reference answer

No. The common U7 folder is consistent with record 1 but R5 expressly identifies E3 in record 2. It can be listed under U7 with E3 scope; record 3's E2 query remains unmet unless a distinct or explicitly shared report appears.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Inferring report coverage from a folder name
  • Assigning an E3 report to a sibling component

Change the inputs and run it again

Add a multi-component report naming both E2 and E3 and preserve page-level scope for each.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

Paper records only; exclude genuine equipment reports, operating guidance and compliance statements.

Exclude sensitive product specifications, fabrication settings, customer drawings and any actual operating or qualification details.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Manufacturing