Solar generation and irradiance alignment data for AI

Power and irradiance can look unrelated when their records use different timestamps.

Sector
Utilities
2022 NAICS
221114
Updated

What this guide tests

Which irradiance timestamp aligns with the known zero, and can the missing power observation be recovered from this packet?

See the specimen and fields · Work through the fictional records

Task and source context

Power and irradiance can look unrelated when their records use different timestamps. The public PVDAQ datasets provide examples of photovoltaic observations and associated documentation. A solar operator can propose a narrow timing exercise using artificial traces before discussing any real records. PVDAQ public datasets

Create a fictional power series and an irradiance series from the same training interval. Shift one clock, document the reference time, and add a genuinely missing interval. Ask which observations can be aligned and which cannot be recovered from the sample. Require the model to distinguish a recorded zero from a missing measurement.

Use invented time series or verified public data within its terms. Keep site layouts, equipment configuration, private performance, precise locations and access details out of the example.

Describe a solar time-alignment sample

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

221114 · Solar Electric Power Generation

This U.S. industry comprises establishments primarily engaged in operating solar electric power generation facilities. These facilities use energy from the sun to produce electric energy. The electric energy produced in these establishments is provided to electric power transmission systems or to electric power distribution systems.

U.S. Census Bureau, 2022 NAICS Manual, p. 114 ↗

Build a pilot sample

Set up this pilot

Generate fictional solar and irradiance traces with a witnessed clock offset and a true missing point. Grade time alignment separately from whether a value exists.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

Clock reference and offset
Document which clock is fast and the direction of correction.
Observation presence
Distinguish a recorded value from an absent measurement.
Quantity identity
Keep power and irradiance as separate series.

Use Plan a sample of business data for AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

Align an artificial fast clock without filling missing power

Fictional power and irradiance labels illustrate timing and missingness. No site performance, equipment configuration or actual measurement is represented.

Records supplied to the evaluator
Record IDSourceWhat it records
CLOCK-S1Practice clock noteThe irradiance logger reads five minutes fast relative to the UTC reference used by the power series.
POWER-S2Artificial power seriesAt reference 13:05, the recorded value is zero. The 13:10 observation is missing.
IRRAD-S3Artificial irradiance seriesLogger times 13:10 and 13:15 both contain recorded values. The note states no other correction.

Question for the model. Which irradiance timestamp aligns with the known zero, and can the missing power observation be recovered from this packet?

Show the reference answer

Subtract five minutes from the irradiance logger's time under CLOCK-S1. Its 13:10 observation aligns with reference 13:05, where power is a recorded zero. Its 13:15 observation aligns with reference 13:10, where power is missing. An irradiance value does not supply the absent power reading. Preserve the known zero and the missing observation as different states.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Adding the clock offset in the wrong direction.
  • Replacing a missing power observation with zero.
  • Inventing a power value from a different measured quantity.

Change the inputs and run it again

Change the note to a logger that reads five minutes slow. Alignment should reverse without changing the missingness rule.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

The traces and offset are invented. Exclude layouts, access details, precise locations and private generation records. The answer makes no equipment diagnosis.

Use a controlled simulation or an authorized export with topology, customer details and control-system information removed.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work

Company and program reviews

Use these reviews to compare sourcing, capture or evaluation approaches. Confirm the applicable program, accepted sources and terms with the provider.

All company reviews

Related industry examples

← Utilities