Roadwork material ticket and placement data for AI

A delivery ticket can show that material arrived.

2022 NAICS
237310
Updated

What this guide tests

Which ticket quantity has a verified S1 placement, and what can the packet establish about D2 at S2?

See the specimen and fields · Work through the fictional records

Task and source context

A delivery ticket can show that material arrived. It may not establish where it was placed. FHWA’s e-ticketing and digital as-built program describes use of electronic records in highway construction. A contractor can prepare an invented data exercise linking a ticket to a segment and an authorized observation. FHWA e-ticketing and digital as-builts

Invent two tickets and two segments in a fictional paving log. Give one a confirmed placement and attach the other to an unrelated inspection by date alone. Ask which segments are supported, whether quantities represent delivery or placement, and which link must be verified. Keep the independent review as a separate record.

Do not use live sites, project pricing, client details, traffic plans, infrastructure locations, or actual ticket images without permission. No roadside recording is needed.

Describe a placement reconciliation sample

Industry research

The U.S. Census Bureau’s industry definitions establish which activities these codes cover. The workflow sources in this guide describe the task or record type. Fiund’s pilot below uses fictional material to test a specific decision within that scope.

237310 · Highway, Street, and Bridge Construction

This industry comprises establishments primarily engaged in the construction of highways (including elevated), streets, roads, airport runways, public sidewalks, or bridges. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to highway, street, and bridge construction (e.g., installing guardrails on highways).

U.S. Census Bureau, 2022 NAICS Manual, p. 126 ↗

Build a pilot sample

Set up this pilot

Build mock roadwork tickets with delivered quantities and partial placement by segment. Grade allocated quantity and preserve an unassigned remainder rather than copying the delivery total.

Prepare the test packets

  1. Start with the worked case. Use the fictional record types below as a guide to the source files you need. Give each packet a stable ID and save its source versions with it.
  2. Change one fact. Make one packet with enough evidence to answer the question and one where the evidence points to a different answer. Keep the other fields fixed so a reviewer can tell what changed.
  3. Remove the decisive evidence. Give the reviewer a third packet with a plausible near-match in its place. Have them write what can still be established and what evidence would resolve the rest.

Fields the reviewer needs

Ticket identity and quantity role
Separates delivered from placed amounts.
Segment allocation and observation
Provides the explicit link supporting placement.
Unallocated remainder
Preserves material that lacks a placement record.

Use How construction and trade teams can contribute data for AI to turn the specimen into a brief with a defined task, source and review owner.

Fictional exercise

Delivery evidence and placement evidence use different quantity scopes

A fictional paving log contains two tickets and two abstract segments. No live road, traffic arrangement, material specification or project quantity is represented.

Records supplied to the evaluator
Record IDSourceWhat it records
RT1Invented delivery ticket D112 practice units delivered; destination job J, no segment field.
RT2Reviewed placement log8 of D1's units linked to segment S1, reviewed under observation O1. Remaining 4 have no placement allocation.
RT3Ticket D2 and attachmentD2 delivers 6 units. An inspection of S2 shares the date but contains no D2 reference or placement quantity.

Question for the model. Which ticket quantity has a verified S1 placement, and what can the packet establish about D2 at S2?

Show the reference answer

RT2 verifies an 8-unit placement from D1 at S1, distinct from RT1's 12-unit delivery total. D1's remaining 4 units have no supplied placement allocation. RT3 confirms D2's delivery and an S2 inspection on the same date, but not a relationship between them. Do not report D2 as placed at S2 or treat all delivered material as verified placement.

Download the fictional records and answer key (JSON)

How to check the result

Ask for the answer, the record IDs that support it and any fact the evidence leaves unresolved. Have a reviewer compare the response against the reference before deciding whether the sample is ready to expand.

Errors to flag in this case

  • Reporting all 12 D1 units as placed at S1 when only 8 are linked.
  • Joining D2 to the S2 inspection solely on date.

Change the inputs and run it again

Supply a D2 allocation to S1 rather than S2. Test whether the model follows that evidence despite the earlier same-day S2 attachment.

Score the decision and the evidence separately

Save the reviewer’s expected answer, supporting record IDs and unresolved fields in a separate answer key. Score the model on the decision, its citations and its handling of the deliberate gap. A correct answer citing a different case counts as an evidence error.

Before expanding collection, have a second reviewer run the same checks on the held-out packet. Keep related versions, views and exports of the same case together so they stay on one side of the training and evaluation split.

Check permission and scope

Use independent fictional records only. Exclude actual tickets, infrastructure locations, pricing, clients, traffic plans and roadside recording.

Use fictional coordinates or cleared plans. Avoid active infrastructure maps, routing details and site security information.

Describe an authorized archive through Fiund’s existing-data assessment, or describe a new capture capability through the collection brief. The contributor agreement covers the terms for participation.

Sources and further reading

Resources for this workflow

How the examples work