{
  "title": "Landscape architecture path alignment and site records for AI",
  "source_page": "https://fiund.com/industries/landscape-design-route-evidence-data",
  "authorship": "Original fictional Fiund editorial exercise. No actual operating records or third-party source assets are included.",
  "example": {
    "title": "A revised route cannot inherit a measurement from the old alignment",
    "context": "Two original abstract path alignments have dummy segment measurements. There is no real site, accessibility conclusion, protected feature or design approval.",
    "records": [
      [
        "LAR1",
        "Practice alignment A",
        "Segment A1 has reviewed measurement Q=4 units under condition C."
      ],
      [
        "LAR2",
        "Approved plan revision B",
        "Replaces A1 with differently routed segment B1. No B1 measurement supplied."
      ],
      [
        "LAR3",
        "Circulating annotation",
        "Shows Q=4 beside B1 but explicitly cites A1's earlier field card. No equivalence or new observation recorded."
      ]
    ],
    "question": "Which alignment has direct measurement evidence, and does moving its annotation onto B1 establish B1's value?",
    "answer": "LAR1 directly supports Q=4 for A1 under condition C. LAR2 changes the route to B1 without a matching observation. LAR3 still cites A1's source, so annotation placement does not establish a new B1 measurement or equivalence. Report the verified old-alignment value and the new segment's evidence gap rather than treating a plan revision as a transferred field result or a compliance determination.",
    "failureModes": [
      "Applying an old alignment's measurement to a differently routed segment.",
      "Treating a moved annotation as a newly verified field observation."
    ],
    "fields": [
      [
        "Alignment and segment revision",
        "Defines the measured geometry."
      ],
      [
        "Measurement source and condition",
        "Preserves the actual observation."
      ],
      [
        "Annotation-to-source link",
        "Exposes stale values on revised plans."
      ]
    ],
    "holdout": "Add B1's independent measurement with a different value while A1 remains in the archive. Require revision-specific retrieval rather than choosing the familiar older number.",
    "boundary": "Use independent abstract drawings. Exclude boundaries, owners, protected site features and client plans."
  }
}
