{
  "title": "Custom harvest load records for AI reconciliation",
  "source_page": "https://fiund.com/industries/custom-harvest-load-allocation-data",
  "authorship": "Original fictional Fiund editorial exercise. No actual operating records or third-party source assets are included.",
  "example": {
    "title": "A scale ticket can confirm a mixed load total without confirming its split",
    "context": "A fictional cart receives material from two practice runs. All weights, clients and field aliases are artificial, with no equipment operation or actual harvest represented.",
    "records": [
      [
        "CH1",
        "Cart handoff log",
        "Run A and Run B both contribute to cart C. Boundaries of contribution times recorded, but no intermediate weighing."
      ],
      [
        "CH2",
        "Scale ticket S",
        "Cart C final combined net mass 100 practice units. Ticket confirms total only; no run-specific components."
      ],
      [
        "CH3",
        "Operator estimate",
        "Draft allocation A=60, B=40 labeled estimated. No separate measurements, agreed allocation method or reviewer acceptance supplied."
      ]
    ],
    "question": "Which mass figure is independently supported, and can A's and B's stated shares be presented as measured values?",
    "answer": "CH2 independently supports the combined 100-unit load total. CH1 confirms that both runs contributed but supplies no intermediate mass measurement. CH3's 60/40 split is explicitly an estimate without a measured or agreed allocation basis. Preserve it as an unverified proposed allocation rather than a pair of measured run totals. Matching the scale ticket arithmetically does not establish the accuracy of the component shares.",
    "failureModes": [
      "Treating a balancing estimated split as independently measured component weights.",
      "Assuming contribution duration proves mass share without a documented relationship."
    ],
    "fields": [
      [
        "Cart and contributing run aliases",
        "Defines the mixed load."
      ],
      [
        "Scale ticket and measurement level",
        "Identifies the supported total."
      ],
      [
        "Allocation method, estimate flag and approval",
        "Separates component claims from verified mass."
      ]
    ],
    "holdout": "Add a verified intermediate mass of 55 units at the end of A before B begins. Require the inferred 55/45 split only if no other addition or removal is documented.",
    "boundary": "Use recreated logs and arbitrary amounts. Exclude farm names, routes, actual yields and crew information; harvester, grower and platform rights are separate checks."
  }
}
